Honesty label: MEASURED HERE, baseline only. The before/after comparison has not been run yet.
Hypothesis
Two scheduled jobs that start in the same second (both at 03:00:00) take longer, or fail more often, than the same jobs started 17 minutes apart. Falsified if the median runtime difference is under 5% and failure rates are equal.
Data
- The nightly log of a graph-refresh job, covering 1 October to 20 November 2026.
- The schedule of a second job, a database sync, which was set to start at the same second from 1 November.
The sync job's own nightly results before 20 November are missing: the scheduler's history was switched off and the job kept no log. This baseline therefore covers one of the two jobs.
Method
A parser first had to reproduce an earlier count of the refresh job's start times. It then read every scheduled run: start, end, completed or stopped, the failing step, and step times.
The runs were grouped into three arms:
| Arm | Dates | Nights | Set-up |
|---|---|---|---|
| ALONE | 8–31 October | 24 | Refresh ran without the sync |
| SAME SECOND | 1–19 November | 19 | Both jobs started at 03:00:00 |
| ONE AFTER THE OTHER | From 20 November | 1 | Sync starts when the refresh ends |
Nights on which the log shows the database refusing connections were marked as outage nights, and failures were counted with and without them.
Result
| Arm | Nights | Failed | Outage nights | Failed, outages removed | Median runtime, completed nights |
|---|---|---|---|---|---|
| Alone (October) | 24 | 15 | 15 | 0 of 9 | 1,785 s |
| Same second (November) | 19 | 9 | 2 | 7 of 17 | 1,355 s |
| One after the other | 1 | 0 | 0 | 0 of 1 | 2,167 s |
- Same-second starts were not shown to fail less. Counting all nights makes November look better, but every October failure was a database outage. With outage nights removed, the job never failed when it started alone (0 of 9) and failed on 7 of 17 same-second nights.
- The November failures look like data faults rather than the two jobs getting in each other's way. One step reported tens of thousands of unreconciled rows, and another reported a database error. That reading is unproven, because the sync's own run times on those nights are unknown.
- Completed same-second nights ran faster at the median, by 24%. The first step took about the same time in both months (771 vs 755 s).
- Since 20 November the two jobs run one after the other, which is a different change from the planned 17-minute offset.
What the comparison still needs
- At least 14 nights of the new set-up, so 3 December at the earliest.
- A nightly record for the sync job, which the new set-up now writes.
- Failures reported with and without outage nights, with the cause given for each night.
Plain language
Two of our nightly jobs used to start at exactly 3:00:00. We wanted to know whether starting together causes trouble. On nights the database was down, everything failed regardless, and October had many of those. Leaving those nights out, the job never failed in October when it started alone, but it failed on 7 of 17 November nights when the two started together. Those failures look like data problems, but we cannot prove they were not caused by the overlap. So we have not shown that starting together is harmless. The jobs now run one after the other, and two weeks of that will give a fairer test.
Caveats and what would falsify a future claim
- The arms are different months with different database health. This is an observational baseline, not a controlled test.
- The October 04:00 runs (daylight time) and the November 03:00 runs (standard time) happened at the same moment in UTC.
- How long the two jobs actually overlapped is unknown.
- The outage marker is a text match. A night with both an outage and another fault counts as an outage night.
- Would support the hypothesis: over at least 14 nights of the new set-up with the database up, fewer failed nights than 7 of 17, or a median runtime at least 5% lower.
AI-assisted, human-directed.